Skip to content Skip to footer
Siesta Key Platform Boat Lift Seawall

Florida Shoreline completed a comprehensive waterfront upgrade on Siesta Key, featuring a new seawall, platform boat lift, and boat dock designed for durability and everyday usability.

The seawall spans 120 linear feet and was constructed using ShoreGuard vinyl panels, reinforced with Manta Ray earth anchors to provide long-term structural stability in a demanding coastal environment.

The boat dock was built with WearDeck decking in Barefoot Sand, offering a clean, modern appearance along with excellent resistance to moisture, wear, and sun exposure.

A key feature of the project is the DECO 6,000-pound Beamless Concept CRS platform boat lift paired with a 20′ x 20′ decked platform, delivering versatile functionality for personal watercraft and additional waterfront use. The project also included the removal and reinstallation of an existing 20,000-pound boat lift, ensuring continued use of larger vessels.

To further enhance accessibility and usability, an exterior aluminum walkway was installed, providing convenient access to the far side of the lift system.

This project highlights a well-integrated approach to waterfront construction, combining engineered strength with practical, user-focused design.

LocationSiesta Key, FloridaJobSeawall installation (120 LF ShoreGuard vinyl + Manta Ray anchors) + boat dock construction (WearDeck) + platform boat lift + lift reinstallationShare