Another completed project and happy customer. This project on Siesta Key was a complete redo of their waterfront—a new seawall, boat dock, and boat lift. The new seawall is constructed utilizing ShoreaGuard’s coextruded vinyl sheet panels, a concrete cap with Penetron admix (helps reduce shirkage cracking), and Chance helical tiebacks. After the seawall was constructed our barge crew came in to build the boat dock and boat lift. The boat dock as plastic pile wrap to help protect the pilings from marine boring organisms, all stainless steel hardware, and fiberglass reinforced HPDE Barefoot Gray WearDeck decking. The boat lift is a 10,000 lb. Hurricane Boat Lift with a remote control and auto stop. All of these high-quality features are not high priced options, but standard features on all of our projects.
The happy customers had the following to say:


