top of page

Beach Road Drainage Improvements, Siesta Key

Florida Shoreline helped with the Siesta Key drainage and parking lot improvements. A PVC discharge pipe was installed to take water away from the beach, 1/2 mile off shore.  Florida Shoreline installed 12 helical pilings to hold and secure the end of the pipe. 

 

This is the engineers inspection video of the finished product.

bottom of page